Buildings, repeated floors and specialist quantities
Organize multistorey measured scope, openings, envelope and formwork reuse.
Set up physical floors
Use Project setup & WBS and Building & floors to define the project structure and repeated floor types. Assigned activities expand across their physical floors. Separate genuinely different levels rather than repeating an unsuitable typical floor.
Measure the building fabric
Use Openings & glazing, Roof & envelope and Formwork reuse for their supported scheduled components. Review deductions, coverage, material specifications, purchase sizes and reuse assumptions. Avoid counting an opening or surface twice in linked scope.
Price height-related work explicitly
Review Vertical logistics, Concrete pumping and Access & temporary works separately. Floor count alone cannot determine their cost. Foundations, structural adequacy, wind/seismic design, engineered lifting and temporary-works design require approved specialist information.