Know the method.
Review the result.
Practical guidance for quantities, purchases, costs and resources—from a first budget to a reviewed estimate.
Start with the right workflow
- Define scope and exclusions before measuring.
- Use reviewed dimensions, dated rates and the units shown in the tool.
- Inspect warnings and assumptions before accepting or exporting results.
- Keep a project backup and obtain the professional review your project requires.
These product guides explain supported workflows. They are not engineering certification, local code advice or a supplied market-rate database. Examples are illustrative; no independent professional endorsement is claimed.
Browse all tools ↗ · Calculation methodology ↗Core estimating guides
From measurement to a project estimate
A practical workflow for quantities, material purchases, resource costs and a reviewable construction estimate.
PRACTICAL GUIDE ↗Work quantities, material quantities and what to buy
Understand packaging, stock lengths, allowances and why purchasing quantities differ from measured work.
PRACTICAL GUIDE ↗Calculate crews, equipment and work duration
Plan from resources to time, or from a target date to the resource demand, using explicit production assumptions.
PRACTICAL GUIDE ↗Allow for price changes without hiding the basis
Separate escalation, exchange exposure, contingency and markup in a transparent construction budget.
PRACTICAL GUIDE ↗Quick Estimate: from benchmark to a detailed project
Prepare an indicative building, pavement, pipeline or earthwork budget without presenting it as a measured bill of quantities.
PRACTICAL GUIDE ↗Buildings, repeated floors and specialist quantities
Organize multistorey measured scope, openings, envelope and formwork reuse.
PRACTICAL GUIDE ↗Estimate mechanical, electrical, plumbing and fire protection
Build a measured services estimate from equipment schedules, measured runs and stated specifications.
PRACTICAL GUIDE ↗Civil works, roads, site development and earthwork balance
Measure horizontal works with alignments, layers, chainages and explicit volume factors.
PRACTICAL GUIDE ↗From purchase schedules to delivery and logistics
Plan materials, internal procurement records, hauling, pumping and vertical transport.
PRACTICAL GUIDE ↗Programme, observed progress and completion forecasts
Connect working calendars and planned resources with actual progress and remaining work.
PRACTICAL GUIDE ↗Internal cost control, variations, valuations and cash flow
Keep estimates, commitments, actual costs and commercial declarations distinct.
PRACTICAL GUIDE ↗Saved records, currencies, libraries and reports
Retain source information and export a report with a clear cost and currency basis.
Drawing, model and planning workflows
Choose a tool below for its input requirements and review steps. Files processed locally are not automatically uploaded or saved to your account. Portfolio review requires sign-in; the numeric API processes submitted inputs on the server.
Manual drawing measurement ↗
Calibrate PDF, PNG or JPEG drawings; trace lengths and areas or record counts.
How to use it: Use a known dimension on each page, check the measurement units, then review proposed measurements before exporting the register.
Scope: Manual review only. No automatic takeoff, drawing upload or saved-project update.
Related practical guide ↗Drawing revision comparison ↗
Compare earlier and later drawings with an overlay and visual difference map.
How to use it: Choose corresponding pages, align matching reference points and inspect coverage before recording reviewed differences.
Scope: Pixel differences are review aids, not proof of a design change or automatic quantity adjustment.
Related practical guide ↗IFC quantity review ↗
Inspect element quantities declared in a plain IFC export, with units and source warnings.
How to use it: Export element base quantities from your BIM authoring tool, inspect supported elements and units, then export the reviewed schedule.
Scope: Reads supplied quantities, not geometry. No native Revit import, 3D viewer or automatic project update.
Related practical guide ↗Mixed stock & offcut planning ↗
Plan mixed cut lengths against finite stock and reusable offcuts, including saw kerf.
How to use it: Enter compatible stock and required pieces in the stated units, include kerf and review shortages and projected remnants.
Scope: A bounded planning heuristic. No globally optimal result, structural splice approval or physical inventory update.
Related practical guide ↗Scheduling & resource leveling ↗
Review dependencies, working calendars and limited resource capacities.
How to use it: Define activity relationships and capacity calendars, run the bounded search and review blocked activities and the resulting dates.
Scope: A standalone scenario. No individual shift planning, universal feasibility guarantee or automatic saved-programme update.
Related practical guide ↗Portfolio estimate review ↗
Compare your own saved current estimates in separate currency and project-type groups.
How to use it: Sign in, review scope completeness and missing inputs, then compare like-for-like groups and export the review.
Scope: Owner-only current estimates. No currency aggregation, actual-cost forecast or company-wide sharing.
Related practical guide ↗Calculation API & file adapters ↗
Use the documented stateless cutting calculation API and portable file examples.
How to use it: Review the OpenAPI schema, send only supported numeric inputs and handle documented validation and rate-limit responses.
Scope: No external private-account access, saved-project write API or live provider synchronization.
Related practical guide ↗Supplier catalogue & RFQ exchange ↗
Match locally supplied catalogue and request-for-quotation CSV files by exact supplier and item identifiers.
How to use it: Prepare the documented CSV columns, review matches, units, currency and quote validity, then export the reviewed comparison.
Scope: No supplier account connection, confirmed stock, purchase order transmission or payment.
Related practical guide ↗Regional rate importer ↗
Review your own normalized rate file with declared region, source dates and licence permissions.
How to use it: Confirm provider permission before processing, inspect metadata and unit/tax basis, and export only where the declared rights permit it.
Scope: Importer only; synthetic example only; no commercial rate dataset supplied. Metadata checks do not verify ownership or grant a licence.
Related practical guide ↗What comes later?
AI takeoff and interpretation, live supplier connections, broader BIM geometry and actual licensed regional rates remain future scope. The rate importer contains a synthetic example only. Pro, Business and Enterprise are described on Pricing; company access uses verified membership, roles and assignments.
Suggest a guide or discuss a workflow ↗