Practical guidance for quantities, purchases, costs and resources—from a first budget to a reviewed estimate.

Start with the right workflow

  1. Define scope and exclusions before measuring.
  2. Use reviewed dimensions, dated rates and the units shown in the tool.
  3. Inspect warnings and assumptions before accepting or exporting results.
  4. Keep a project backup and obtain the professional review your project requires.

These product guides explain supported workflows. They are not engineering certification, local code advice or a supplied market-rate database. Examples are illustrative; no independent professional endorsement is claimed.

Browse all tools ↗ · Calculation methodology ↗

Core estimating guides

PRACTICAL GUIDE ↗

From measurement to a project estimate

A practical workflow for quantities, material purchases, resource costs and a reviewable construction estimate.

PRACTICAL GUIDE ↗

Work quantities, material quantities and what to buy

Understand packaging, stock lengths, allowances and why purchasing quantities differ from measured work.

PRACTICAL GUIDE ↗

Calculate crews, equipment and work duration

Plan from resources to time, or from a target date to the resource demand, using explicit production assumptions.

PRACTICAL GUIDE ↗

Allow for price changes without hiding the basis

Separate escalation, exchange exposure, contingency and markup in a transparent construction budget.

PRACTICAL GUIDE ↗

Quick Estimate: from benchmark to a detailed project

Prepare an indicative building, pavement, pipeline or earthwork budget without presenting it as a measured bill of quantities.

PRACTICAL GUIDE ↗

Buildings, repeated floors and specialist quantities

Organize multistorey measured scope, openings, envelope and formwork reuse.

PRACTICAL GUIDE ↗

Estimate mechanical, electrical, plumbing and fire protection

Build a measured services estimate from equipment schedules, measured runs and stated specifications.

PRACTICAL GUIDE ↗

Civil works, roads, site development and earthwork balance

Measure horizontal works with alignments, layers, chainages and explicit volume factors.

PRACTICAL GUIDE ↗

From purchase schedules to delivery and logistics

Plan materials, internal procurement records, hauling, pumping and vertical transport.

PRACTICAL GUIDE ↗

Programme, observed progress and completion forecasts

Connect working calendars and planned resources with actual progress and remaining work.

PRACTICAL GUIDE ↗

Internal cost control, variations, valuations and cash flow

Keep estimates, commitments, actual costs and commercial declarations distinct.

PRACTICAL GUIDE ↗

Saved records, currencies, libraries and reports

Retain source information and export a report with a clear cost and currency basis.

Drawing, model and planning workflows

Choose a tool below for its input requirements and review steps. Files processed locally are not automatically uploaded or saved to your account. Portfolio review requires sign-in; the numeric API processes submitted inputs on the server.

Available tools

Manual drawing measurement ↗

Calibrate PDF, PNG or JPEG drawings; trace lengths and areas or record counts.

How to use it: Use a known dimension on each page, check the measurement units, then review proposed measurements before exporting the register.

Scope: Manual review only. No automatic takeoff, drawing upload or saved-project update.

Related practical guide ↗
Available tools

Drawing revision comparison ↗

Compare earlier and later drawings with an overlay and visual difference map.

How to use it: Choose corresponding pages, align matching reference points and inspect coverage before recording reviewed differences.

Scope: Pixel differences are review aids, not proof of a design change or automatic quantity adjustment.

Related practical guide ↗
Available tools

IFC quantity review ↗

Inspect element quantities declared in a plain IFC export, with units and source warnings.

How to use it: Export element base quantities from your BIM authoring tool, inspect supported elements and units, then export the reviewed schedule.

Scope: Reads supplied quantities, not geometry. No native Revit import, 3D viewer or automatic project update.

Related practical guide ↗
Available tools

Mixed stock & offcut planning ↗

Plan mixed cut lengths against finite stock and reusable offcuts, including saw kerf.

How to use it: Enter compatible stock and required pieces in the stated units, include kerf and review shortages and projected remnants.

Scope: A bounded planning heuristic. No globally optimal result, structural splice approval or physical inventory update.

Related practical guide ↗
Available tools

Scheduling & resource leveling ↗

Review dependencies, working calendars and limited resource capacities.

How to use it: Define activity relationships and capacity calendars, run the bounded search and review blocked activities and the resulting dates.

Scope: A standalone scenario. No individual shift planning, universal feasibility guarantee or automatic saved-programme update.

Related practical guide ↗
Available tools

Portfolio estimate review ↗

Compare your own saved current estimates in separate currency and project-type groups.

How to use it: Sign in, review scope completeness and missing inputs, then compare like-for-like groups and export the review.

Scope: Owner-only current estimates. No currency aggregation, actual-cost forecast or company-wide sharing.

Related practical guide ↗
Available tools

Calculation API & file adapters ↗

Use the documented stateless cutting calculation API and portable file examples.

How to use it: Review the OpenAPI schema, send only supported numeric inputs and handle documented validation and rate-limit responses.

Scope: No external private-account access, saved-project write API or live provider synchronization.

Related practical guide ↗
Available tools

Supplier catalogue & RFQ exchange ↗

Match locally supplied catalogue and request-for-quotation CSV files by exact supplier and item identifiers.

How to use it: Prepare the documented CSV columns, review matches, units, currency and quote validity, then export the reviewed comparison.

Scope: No supplier account connection, confirmed stock, purchase order transmission or payment.

Related practical guide ↗
Available tools

Regional rate importer ↗

Review your own normalized rate file with declared region, source dates and licence permissions.

How to use it: Confirm provider permission before processing, inspect metadata and unit/tax basis, and export only where the declared rights permit it.

Scope: Importer only; synthetic example only; no commercial rate dataset supplied. Metadata checks do not verify ownership or grant a licence.

Related practical guide ↗

What comes later?

AI takeoff and interpretation, live supplier connections, broader BIM geometry and actual licensed regional rates remain future scope. The rate importer contains a synthetic example only. Pro, Business and Enterprise are described on Pricing; company access uses verified membership, roles and assignments.

Suggest a guide or discuss a workflow ↗