Understand every number.

Calculations use deterministic arithmetic. Formula descriptions, assumptions and exclusions accompany each work item.

Quantities and purchasing

Geometric work quantities are calculated from supplied dimensions. Explicit deductions cannot produce a negative result. Allowances are applied to resources, then purchase quantities are rounded up to the supplied commercial pack or stock size. Mortar and adhesive factors are preliminary editable allowances. Rebar calculations use equal-length cutting feasibility and an approximate mass factor of 0.006165 × diameter² kg/m.

Cost calculation

Material cost uses purchase quantity × unit price × explicit exchange multiplier. Labor cost uses productive activity days × crews × workers per crew × daily wage. Equipment cost uses productive days × equipment units × daily equipment rate. Overhead applies to direct cost; profit to direct cost plus overhead; contingency to direct cost; tax to the resulting subtotal. A changed work quantity does not silently rescale its resource schedule.

Time and resources

Duration uses the bottleneck between entered crew output and equipment output. Each activity duration rounds up to a working day for scheduling. Finish-to-start relationships and nonnegative working-day lags are supported. Activities without predecessors start independently. Programme supports supplied holidays and explicit floor sequencing. Remaining-work forecasts can opt into pooled/typed whole-unit resource leveling, declared availability and shift compatibility, activity priorities and booking interruptions. A bounded comparison of three queue orders may improve the complete finish; it does not establish a global optimum. Supplied haul/supply scenarios compare steady-state capacities separately and do not rewrite the programme.

Scenario analysis

Material, wage, fuel-exposed equipment and FX-exposed material changes are additive sensitivities. They do not forecast markets, compound automatically, or reprice markup and tax. Exposure assumptions should reflect unfixed remaining work.

Internal commercial records and evidence

Project-owned commitments, actual costs and dated credit/debit/reversal notes remain separate from takeoff estimates. Physical cost allocation and assessed remaining-work rates support entered-data EAC when scope and coverage are complete. Frozen direct-cost/programme baselines provide measured earned/planned value comparisons. Internal order declarations, accepted/rejected receipts, stock issues/returns and cumulative valuations are owner-entered records; they do not transmit supplier orders, certify contracts or create payments. Private project evidence has owner-checked downloads and is backed up separately from estimate JSON. Saved revision comparisons are editable project history, not a tamper-proof accounting audit.

Scope of the service

TrendyBuilders provides estimating and planning tools, with paid Pro, Business and Enterprise subscriptions and role-based company review workflows. These workflows support recorded review decisions; they do not certify engineering designs or contracts. The service does not provide structural analysis, code certification, AI drawing takeoff, live supplier pricing or a guarantee of globally optimal cutting. Reports reflect entered scope; missing sections remain review items.