From measurement to a project estimate
A practical workflow for quantities, material purchases, resource costs and a reviewable construction estimate.
Start with a defined scope
Choose a building, road or pipeline project. List the work sections you intend to estimate. A complete building budget may include substructure, structure, envelope, finishes, services, external works, preliminaries and owner costs. An omitted section is not a zero-cost section.
Measure before pricing
Enter dimensions in the selected length system. Explicit area, volume and coverage fields retain the units shown beside their labels. Review deductions, openings and allowances. Add each calculation to the project, then check its formula and exclusions.
Replace example rates
Starter prices are illustrative numeric inputs, not local market data. Enter dated supplier quotations and your own labor and equipment rates. Separate display currency from the project cost basis. A different presentation currency uses an entered exchange rate; explicit cost-basis conversion is a separate operation. Imported resources need a reviewed exchange multiplier.
Review resources and report
Set crew production, workers, equipment and calendars. Connect dependent activities. Review scope statuses, export a spreadsheet-compatible CSV, and print the report or save it as PDF. Save an account project or export a JSON backup to retain the estimate.