Bored pile quantities calculator

Estimate bored length, concrete, scheduled cage steel and loose spoil.

Calculation method

Total bored length = count × pile length. Concrete uses the cylindrical bore area, overpour length and order allowance. Spoil uses bored length and the bulking factor.

Worked example

Ten 900 mm piles bored 18 m each give 180 m of bored length and about 129.461 m³ of concrete with the sample overpour and allowance.

Scope and assumptions

Use the specified pile and reinforcement schedules. Price casing, slurry, mobilization and testing separately. Pile capacity and cage design require separate checks.