Engineering Calculators

125 free calculators across 5 categories

Free tools for engineering and commercial checks. Enter your inputs and see the result, calculation method and assumptions without signing in.

Geotechnical & Foundations

25 tools
Pad footing concrete →

Measure concrete volume for identical rectangular pad footings using specified dimensions.

Manual entry to project
Bored pile quantities →

Estimate bored length, concrete, scheduled cage steel and loose spoil.

Workspace transfer supported
Foundation granular bedding →

Estimate compacted and loose bedding quantities beneath rectangular foundations.

Manual entry to project
Foundation blinding concrete →

Estimate lean concrete for uniform rectangular blinding pads with an edge extension.

Manual entry to project
Pile cap concrete →

Estimate concrete for identical rectangular pile caps from drawing dimensions and measured deductions.

Manual entry to project
Strip footing concrete →

Calculate concrete volume along a uniform strip footing.

Manual entry to project
Pile head cut-off volume →

Estimate the gross concrete volume in cylindrical pile heads scheduled for removal.

Manual entry to project
Drilled shaft casing length →

Estimate the installed casing length for a group of identical shafts.

Manual entry to project
Pile concrete overbreak →

Compare actual placed concrete with the theoretical volume of a pile or a group of identical piles.

Manual entry to project
Piling platform aggregate →

Estimate compacted volume and loose aggregate quantities for a rectangular piling working platform.

Manual entry to project
Ground improvement column quantities →

Summarize installed length and nominal treatment volume for a rectangular grid of ground improvement columns.

Manual entry to project
Retaining wall drainage aggregate →

Estimate aggregate volume and the back face area covered by a drainage zone behind a retaining wall.

Manual entry to project
Prefabricated vertical drain quantity →

Estimate installed drain length and purchase length for scheduled prefabricated vertical drains.

Manual entry to project
Foundation excavation with working space →

Measure in-place excavation volume for identical rectangular pits with vertical sides.

Manual entry to project
Retaining wall geogrid quantity →

Estimate geogrid area across identical full-width reinforcement layers from a specified layout.

Manual entry to project
Precast pile segment quantity →

Count precast pile segments and splices from the approved segment schedule for identical piles.

Manual entry to project
Raft edge formwork →

Measure edge formwork contact area for a rectangular foundation raft and its formed openings.

Manual entry to project
Pile cage longitudinal steel →

Total the scheduled longitudinal reinforcement length and mass for identical pile cages.

Manual entry to project
Soil nail grout quantity →

Estimate theoretical annular grout and order allowance for identical fully grouted soil nails.

Manual entry to project
Ground anchor strand quantity →

Estimate scheduled strand length and mass for identical ground anchor tendons.

Manual entry to project
Under-raft membrane rolls →

Estimate membrane roll purchases from net plan area, measured returns and effective roll coverage.

Manual entry to project
Dewatering wellpoint quantity →

Count positions for identical straight wellpoint runs with an installation point at each end.

Manual entry to project
Foundation drain pipe and cleanouts →

Estimate stock lengths and scheduled cleanouts for separate identical foundation drain runs.

Manual entry to project
Pile test allowance →

Calculate the budget quantity for one test type from a project-specified sampling percentage and minimum count.

Manual entry to project
Excavated soil stockpile footprint →

Estimate a stockpile footprint from bank volume, bulking and the planned average loose stockpile depth.

Manual entry to project

Structural

25 tools
Steel member weight →

Estimate steel weight from the section mass per metre and the member schedule.

Manual entry to project
Beam formwork area →

Measure the soffit and two side faces of rectangular concrete beams.

Manual entry to project
Timber board quantity →

Calculate net timber volume and whole boards to order from actual section dimensions.

Manual entry to project
Reinforcement bar weight →

Convert scheduled bar cut lengths and piece counts into steel weight.

Manual entry to project
Concrete slab volume →

Measure slab concrete from plan dimensions, opening area and uniform thickness.

Manual entry to project
Rectangular column concrete →

Estimate net and order volumes for identical rectangular columns.

Manual entry to project
Concrete wall volume →

Estimate concrete for a uniform wall after deducting measured openings.

Manual entry to project
Slab formwork area →

Measure soffit and edge formwork for a rectangular concrete slab with openings.

Manual entry to project
Steel deck sheet quantity →

Count stock-length steel deck sheets across an uninterrupted rectangular bay using effective sheet cover.

Manual entry to project
Reinforcement lap quantity →

Calculate added steel length and mass for a scheduled set of identical reinforcement lap splices.

Manual entry to project
Base plate grout quantity →

Estimate grout volume and whole bags for identical rectangular base plate grout beds.

Manual entry to project
Concrete stair flight volume →

Estimate concrete for a straight stair flight with a sloping waist slab and uniform steps.

Manual entry to project
Structural steel coating quantity →

Estimate coated area and whole containers for one coating product applied to straight steel members.

Manual entry to project
Structural bolt assembly quantity →

Count bolts, nuts and washers for identical connections using the connection schedule.

Manual entry to project
Reinforcement mesh sheet quantity →

Count whole welded reinforcement mesh sheets for a rectangular zone using specified laps in both directions.

Manual entry to project
Net beam concrete volume →

Measure concrete for repeated rectangular beams with a slab overlap deduction.

Manual entry to project
Round column concrete and formwork →

Measure circular concrete columns and curved side formwork from scheduled diameter and height.

Manual entry to project
Headed shear stud quantity →

Convert scheduled headed shear studs into a purchased count for identical composite beams.

Manual entry to project
Steel plate cut mass →

Estimate gross and net mass for repeated rectangular plates with scheduled round holes.

Manual entry to project
Diagonal bracing cut length →

Estimate diagonal cut length and mass for repeated rectangular bays with scheduled end adjustments.

Manual entry to project
Precast panel concrete mass →

Estimate concrete volume and mass for identical precast panels with full-depth openings.

Manual entry to project
Precast joint sealant quantity →

Convert rectangular precast sealant joint dimensions into a cartridge order.

Manual entry to project
Structural dowel schedule quantity →

Total scheduled dowels, steel length and mass for repeated joints or connections.

Manual entry to project
Tapered topping concrete →

Estimate concrete for floor topping with a uniform width and linearly varying thickness.

Manual entry to project
Steel grating panel quantity →

Count standard panels for rectangular grating bays from the panel dimensions and scheduled orientation.

Manual entry to project

Civil & Infrastructure

25 tools
Earthwork cut, fill & haul →

Estimate bank excavation, compacted fill and loose haul volumes for uniform blocks.

Workspace transfer supported · zero fill only
Pavement layer quantities →

Calculate concrete order volume and granular subbase quantities from specified thicknesses.

Workspace transfer supported
Trapezoidal drain quantities →

Measure excavation quantity for a uniform trapezoidal drainage channel.

Manual entry to project
Asphalt paving tonnage →

Convert pavement area, compacted thickness and mix density into order tonnage.

Manual entry to project
Precast kerb quantities →

Estimate whole precast kerb units for one continuous run at a specified length and joint width.

Manual entry to project
Equipment output and duration →

Estimate working duration from planned output and available operating hours.

Manual entry to project
Trench backfill volume →

Estimate compacted general backfill after deducting a measured embedment zone.

Manual entry to project
Labor crew duration →

Estimate paid labor-hours and working days from productivity, crew size and productive time.

Manual entry to project
Road marking paint quantity →

Estimate paint for solid or broken lines using actual painted length and product coverage.

Manual entry to project
Truck haul cycle output →

Estimate fleet output from complete haul cycles per shift and an effective payload per trip.

Manual entry to project
Concrete demolition volume →

Convert a measured slab demolition area into solid and loose debris volumes.

Manual entry to project
Bulk material delivery trips →

Estimate whole delivery trips and the remaining load for the last trip.

Manual entry to project
Aggregate base order tonnage →

Estimate aggregate base mass from compacted volume and the specified compacted density.

Manual entry to project
Construction water delivery →

Plan water delivery trips from daily demand and available on-site supply.

Manual entry to project
Precast culvert barrel quantities →

Count precast barrel sections and internal joints for identical straight culvert barrels.

Manual entry to project
Gabion basket fill quantity →

Estimate in-place rock fill volume and procurement tonnage for identical rectangular gabion baskets.

Manual entry to project
Roadside guardrail panel quantity →

Count standard panels for one continuous guardrail run between separately measured terminals.

Manual entry to project
Slope hydroseeding quantity →

Convert slope plan dimensions to surface area and estimate seed and mulch from specified application rates.

Manual entry to project
Pavement milling spoil →

Estimate in-place milled volume, loose spoil and volume-based truck trips.

Manual entry to project
Asphalt emulsion spray quantity →

Estimate undiluted emulsion and packs for a scheduled tack or prime coat.

Manual entry to project
Catch basin riser quantity →

Count standard risers for identical catch basins using the scheduled rise and effective section height.

Manual entry to project
Precast channel cover quantity →

Estimate covers for independent channel runs using the usable installed cover length.

Manual entry to project
Silt fence material quantity →

Count rolls and posts for separate straight silt fence runs.

Manual entry to project
Block pavement order quantity →

Estimate paver units and pallets from net surface area and effective coverage.

Manual entry to project
Utility duct spacer quantity →

Count spacer frames for independent utility duct-bank runs from the supplied spacing and frame schedule.

Manual entry to project

MEPF

25 tools
Pipe flow velocity →

Calculate mean velocity in a full circular pipe from flow and internal diameter.

Manual entry to project
Rectangular tank volume →

Calculate contained and usable liquid volume between entered operating levels.

Manual entry to project
Rectangular duct air velocity →

Calculate average air velocity from entered airflow and clear duct dimensions.

Manual entry to project
Pipe water content →

Estimate the water volume held in a full circular pipe run.

Manual entry to project
Rectangular duct insulation area →

Measure straight-run external insulation area from perimeter and length.

Manual entry to project
Circular pipe insulation area →

Estimate straight-run external cladding area over installed pipe insulation.

Manual entry to project
Cable length allowance →

Estimate cable order length for identical runs with termination tails and installation allowance.

Manual entry to project
Cable tray stock lengths →

Estimate whole stock lengths and joints for one straight, continuous tray run.

Manual entry to project
Circular pipe coating area →

Estimate coating area and liquid volume for straight circular pipe runs.

Manual entry to project
Round duct sheet area →

Estimate developed sheet area and material mass for straight circular ductwork.

Manual entry to project
Electrical conduit sticks →

Count stock-length conduit sticks for identical straight runs, rounding each run separately.

Manual entry to project
Pipe slope and elevation drop →

Calculate downstream invert elevation and inclined pipe length from a specified fall.

Manual entry to project
Firestop sealant quantity →

Estimate sealant volume and whole cartridges for identical circular penetrations.

Manual entry to project
Duct access panel quantity →

Count scheduled duct access panels and spares for identical zones.

Manual entry to project
Electrical cable termination kits →

Count termination kits and individual lugs for identical scheduled cable ends.

Manual entry to project
Vertical cylindrical tank usable volume →

Calculate gross tank volume and working storage between two operating levels.

Manual entry to project
Sprinkler head order quantity →

Add specified spare sprinkler heads to a scheduled installation count for a single head type.

Manual entry to project
Duct hanger assembly quantity →

Count hanger assemblies for identical straight duct runs using the approved maximum spacing.

Manual entry to project
Rectangular duct flange stock →

Estimate flange profile stock for scheduled rectangular duct frames.

Manual entry to project
Cable gland and locknut quantity →

Count glands and locknuts from the schedule for one compatible cable-entry assembly.

Manual entry to project
Luminaire schedule power total →

Sum connected input power for two scheduled luminaire types and estimate energy over supplied operating hours.

Manual entry to project
Plumbing fixture connection kits →

Count scheduled shutoff valves and connectors per fixture, with separately entered spares.

Manual entry to project
Pipe flange gasket and bolt quantity →

Count gaskets and individual bolt assemblies for identical flanged joints.

Manual entry to project
Fire extinguisher accessory takeoff →

Summarize extinguisher units, cabinets, brackets and signs from the approved schedule.

Manual entry to project
Equipment filter replacement quantity →

Estimate filter purchases for identical HVAC units over a planned number of full replacements.

Manual entry to project

Commercial & Contracts

25 tools
Price escalation →

Estimate an index-based adjustment for an eligible amount and an adjustable share.

Manual entry to project
Delayed-payment interest →

Calculate simple interest using a supplied annual rate, overdue days and day-count basis.

Manual entry to project
Prolongation cost scenario →

Model time-related costs from entered days, daily costs and adjustments.

Manual entry to project
Retention deduction scenario →

Model a payment retention deduction using an entered rate, amount already retained and overall cap.

Manual entry to project
Variation price scenario →

Model a net price adjustment using added work, omitted work and separately priced adjustments.

Manual entry to project
Unit rate build-up →

Build a unit rate from batch costs for materials, labor, equipment and subcontract work.

Manual entry to project
Advance payment recovery scenario →

Model recovery from one payment using an entered recovery rate and the outstanding advance balance.

Manual entry to project
Estimate cost variance →

Compare a forecast with a baseline budget and calculate the difference in amount and percent.

Manual entry to project
Labor rate change scenario →

Model the cost difference between baseline and revised labor rates for entered hours.

Manual entry to project
Progress payment reconciliation →

Reconcile current and previous cumulative certificate values and calculate the net amount for the current period.

Manual entry to project
Selling price from target margin →

Calculate the selling price, gross profit and equivalent cost markup for a target margin.

Manual entry to project
Forecast cost at completion →

Combine actual cost and remaining forecast costs to estimate the final cost and budget overrun or underrun.

Manual entry to project
Bid normalization →

Adjust one quoted bid to a common scope and compare it against a like-for-like benchmark.

Manual entry to project
Actual time-related site overhead →

Quantify evidenced incremental site overhead for a delay period using verified daily costs.

Manual entry to project
Hudson formula →

Model head-office overhead and profit using the tender allowance percentage.

Manual entry to project
Emden formula →

Model head-office overhead and profit using the contractor’s actual accounts-based percentage.

Manual entry to project
Eichleay formula →

Allocate fixed company-wide overhead by billings and estimate unabsorbed home-office overhead for entered delay days.

Manual entry to project
Delay damages cap scenario →

Apply an entered daily percentage and aggregate cap to chargeable delay days supplied by the user.

Manual entry to project
Retention release scenario →

Estimate a staged release from an eligible retention balance and entered release percentage.

Manual entry to project
Bond premium budget →

Estimate bond premium and fees using a quoted annual rate with simple month-based proration.

Manual entry to project
Remeasurement quantity variance →

Compare baseline and remeasured values for one bill item at an unchanged unit rate.

Manual entry to project
Daywork record valuation →

Value one daywork record using entered labor hours, equipment hours, materials and an applicable markup.

Manual entry to project
Contract budget headroom →

Compare a funding limit with the base commitment, approved changes and separate forecast allowances.

Manual entry to project
Payment-period funding scenario →

Estimate simple financing cost on a constant outstanding balance over a supplied payment period.

Manual entry to project
Materials-on-site payment and setoff →

Estimate current material credit and setoff of earlier credit for materials incorporated this period.

Manual entry to project