Duct hanger assembly quantity calculator
Count hanger assemblies for identical straight duct runs using the approved maximum spacing.
Calculation method
Round up the number of intervals in each run and add one hanger for the final end. Multiply by run count and add spares.
Worked example
Three 18 m runs at 2 m spacing need 30 scheduled hangers and 32 assemblies including two spares.
Scope and assumptions
Assumes a hanger at both ends of each run. Use the approved support layout and measure special supports separately.