TrendyBuilders logoTrendyBuilders
Open workspace ↗
← Engineering Calculators

Electrical cable termination kits calculator

Count termination kits and individual lugs for identical scheduled cable ends.

Calculation method

Add spare kits to the scheduled end count. Multiply the total by the number of cores terminated per end.

Worked example

Twenty-four four-core ends plus two spare kits require 26 kits and 104 lugs.

Scope and assumptions

Assumes one complete kit per cable end and one lug per terminated core. Run each cable and kit type separately.