Labor rate change scenario calculator
Model the cost difference between baseline and revised labor rates for entered hours.
Calculation method
Multiply the eligible hours by each hourly rate. Subtract baseline cost from revised cost.
Worked example
For 2,400 labor-hours, a rate increase from 100 to 112 adds 28,800.
Scope and assumptions
Use one currency and the same cost basis for both rates. This calculation models the entered hours and rates. Contract eligibility is assessed separately.