TrendyBuilders logoTrendyBuilders
Open workspace ↗
← Engineering Calculators

Pavement milling spoil calculator

Estimate in-place milled volume, loose spoil and volume-based truck trips.

Calculation method

Multiply net area by milling depth. Apply the loose volume factor and round up by usable truck capacity.

Worked example

Milling 1,200 m² at 50 mm produces 60 m³ in place, 75 m³ loose and eight trips at 10 m³ per trip.

Scope and assumptions

Use measured milling depths and a project-specific loose factor. Check payload limits separately and reduce usable truck volume if weight governs.