Pavement milling spoil calculator
Estimate in-place milled volume, loose spoil and volume-based truck trips.
Calculation method
Multiply net area by milling depth. Apply the loose volume factor and round up by usable truck capacity.
Worked example
Milling 1,200 m² at 50 mm produces 60 m³ in place, 75 m³ loose and eight trips at 10 m³ per trip.
Scope and assumptions
Use measured milling depths and a project-specific loose factor. Check payload limits separately and reduce usable truck volume if weight governs.