Slope hydroseeding quantity calculator
Convert slope plan dimensions to surface area and estimate seed and mulch from specified application rates.
Calculation method
Use the horizontal run and vertical elevation difference to calculate slope length. Multiply by contour width and apply each rate per 100 m² of slope surface.
Worked example
A 40 m wide panel with 12 m horizontal run and 5 m elevation difference has 520 m² of slope surface, requiring 10.4 kg of seed and 78 kg of mulch at the given rates.
Scope and assumptions
Use a uniform rectangular slope panel. Split irregular slopes into separate panels and enter the application rates from the project specification.